Lineup Vents Enave 210 / 270 V | Connected air duct size, mm | Rated power, W | Maximum airflow, m3/h | Service side | Control system | Reheater | Preheater | BMS protocol |
---|---|---|---|---|---|---|---|---|
125 | 125 | 277 | Right | А21 | Optional | 0 | ModBus | |
125 | 125 | 277 | Left | А21 | Optional | 0 | ModBus | |
125 | 125 | 277 | Right | A14 | ||||
125 | 125 | 277 | Left | A14 | ||||
125 | 125 | 277 | Right | А21 | Optional | 0 | ModBus | |
125 | 125 | 277 | Left | А21 | Optional | 0 | ModBus | |
125 | 125 | 277 | Right | A14 | ||||
125 | 125 | 277 | Left | A14 | ||||
125 | 125 | 277 | Right | А21 | Optional | Built-in | ModBus | |
125 | 125 | 277 | Left | А21 | Optional | Built-in | ModBus | |
125 | 125 | 277 | Right | А21 | Optional | Built-in | ModBus | |
125 | 125 | 277 | Left | А21 | Optional | Built-in | ModBus | |
125 | 182 | 331 | Right | А21 | Optional | 0 | ModBus | |
125 | 182 | 331 | Left | А21 | Optional | 0 | ModBus | |
125 | 182 | 331 | Right | A14 | ||||
125 | 182 | 331 | Left | A14 | ||||
125 | 182 | 331 | Right | А21 | Optional | 0 | ModBus | |
125 | 182 | 331 | Left | А21 | Optional | 0 | ModBus | |
125 | 182 | 331 | Right | A14 | ||||
125 | 182 | 331 | Left | A14 | ||||
125 | 182 | 331 | Right | А21 | Optional | Built-in | ModBus | |
125 | 182 | 331 | Left | А21 | Optional | Built-in | ModBus | |
125 | 182 | 331 | Right | А21 | Optional | Built-in | ModBus | |
125 | 182 | 331 | Left | А21 | Optional | Built-in | ModBus |